Popular:Magnetic flow meterCDU flow meterRadar levelPressure transmitterpH meter geo@supmea.comWhatsApp +86 133 6211 7863
SUPMEAKnowledge
Hub
Request a quote

What are the installation requirements for an electromagnetic flow meter?

By Supmea Application EngineeringPublished Topic: Flow
Short answer

Install an electromagnetic flow meter where the pipe is always full, with at least 10 pipe diameters of straight run upstream and 5 downstream (Supmea's reference conditions). Keep the electrodes horizontal, avoid high points where air collects, and avoid the pump suction side. Prefer vertical pipes with upward flow for slurries, and ground the meter properly, using grounding rings on plastic or lined pipe.

Key points

  • Full pipe at all times; air or partial filling causes large errors.
  • ≥10 D upstream, ≥5 D downstream straight pipe.
  • Electrodes horizontal; avoid pipe high points.
  • Grounding rings for non-conductive pipe; remote type for flooded pits.

Straight run and position

A distorted velocity profile from elbows, valves or reducers shifts the reading. Supmea specifies accuracy with ≥10 DN upstream and ≥5 DN downstream. Put control valves downstream of the meter, so the meter stays full and away from cavitation.

Magmeter straight run for flow meter installation: upstream ≥10 D, downstream ≥5 DFTupstream ≥10 Ddownstream ≥5 Delbow / valveMagmeter straight run: D = pipe inner diameter. Follow the manual for your configuration.
Figure 1. Minimum straight run for the LDG-SUP-A100.
Electromagnetic flow meter installation do and avoid positionsDoAvoidFTvertical, flow upwardpipe always fullgrounding rings onplastic/lined pipeFTtop of a pipe bridge:air collects at electrodesalso avoid pump suction side, partly-full pipes
Figure 2. Electromagnetic flow meter installation do and avoid positions. Illustration: Supmea application engineering.

Orientation

  • Horizontal pipe: electrode axis horizontal, so bubbles at the top and sediment at the bottom do not cover the electrodes.
  • Vertical pipe: flow upward, which keeps the tube full and helps solids pass, the preferred layout for slurries.
  • Avoid: the top of a pipe bridge, free-discharge ends and the pump suction side.

Grounding and electrical

The measuring signal is in the millivolt range, so the liquid must share a stable reference with the meter. Metal pipes are bonded across the flanges; plastic or internally lined pipes need grounding rings or a grounding electrode. Keep away from large motors, VFD cables and strong magnetic fields. Use the remote type with an IP68 sensor for flooded or buried pits.

Commissioning checklist

  1. Pipe full and vented; zero checked at no-flow with the pipe full.
  2. Flow direction arrow matches the process.
  3. Liner and electrode material match the medium.
  4. Liquid conductivity above the meter minimum (≥50 µS/cm for the LDG-SUP-A100). See minimum conductivity.
  5. Output scaled to the PLC range and checked against a reference volume.

Related questions

Can a magmeter be installed right after a pump?

On the discharge side with adequate straight run, yes. Avoid the suction side, where pressure can drop and release gas.

What if I do not have 10 D straight run?

Accuracy will degrade; consider a flow conditioner or ask Supmea about the expected error for your layout.

Sources and further reading

Product specifications quoted here are summarised from Supmea datasheets. Confirm the figures for your exact model before final design.

Get a selection and quotation from an application engineer

Send the medium, pipe size, flow or level range, temperature, pressure and required output. You'll get a recommended model, the datasheet and a quotation.

Tell us about the application

Fill in what you know. An application engineer replies with a model and datasheet, usually within one working day (Beijing time, UTC+8).

Both buttons open your own WhatsApp or email app with the message filled in. Nothing is stored on this website.